The Yamatoji Line (大和路線, Yamatoji-sen?) is the common name of the western portion of the Kansai Main Line. The electrified portion is one of commuter rail lines and services in Osaka-Kobe-Kyoto Metropolitan Area, owned and operated by West Japan Railway Company. The line starts at Kamo Station in Kyoto Prefecture and ends at JR Namba Station in Naniwa-ku, Osaka.
Operations
- Yamatoji Liner (やまとじライナー, Yamatoji rainā?)
- "The Yamatoji Liner" is the commuter liner operated on the Yamatoji Line. There is a "Yamatoji Liner" train from Kizu to JR Namba in the morning on weekdays and Saturdays, and 2 trains from Osaka (Osaka Loop Line) to Kamo in the evening on weekdays. In addition to train tickets, numbered tickets are required.
- Yamatoji Rapid Service (大和路快速, Yamatoji kaisoku?), Regional Rapid Service (区間快速, Kukan kaisoku?)
- "The Yamatoji Rapid Service" start at Kamo or Nara Station and divert from the Kansai Line at Shin-Imamiya Station instead of continuing to JR Namba. From Shin-Imamiya, they run on the Osaka Loop Line, making limited stops to Osaka Station, and then making every stop before completing the loop at Tennoji Station. In the rush hour, they are operated as "the Regional Rapid Service", covering the same route but making every stop on the Osaka Loop Line, and sometimes connecting to the Wakayama Line or the Sakurai Line on the Nara side.
- Rapid Service (快速, Kaisoku?)
- "The Rapid Service" revived because of the adjustment of diagram on March 15, 2008, but the color of the train type was changed from orange to green (the line color of the Yamatoji Line). The trains are operated between Kamo and JR Namba in the rush hour and between Takada and JR Namba via the Wakayama Line in the non-rush hour, however there are 3 trains starting Kashiwara for JR Namba in the morning.
- Direct Rapid Service (直通快速, Kaisoku?)
- The operation of "the Direct Rapid Service" started on March 17, 2008, because of the opening of the Osaka Higashi Line and the adjustment of diagram on March 15, 2008. The trains are operated between Nara and Amagasaki via the Yamatoji Line, the Osaka Higashi Line, the Katamachi Line (Gakkentoshi Line), and the JR Tozai Line.
- Local (普通, Futsū?)
- "The Local trains" stop at every station on the Yamatoji Line between Kamo and JR Namba. They are operated between Nara, Oji or Kashiwara and JR Namba in the non-rush hour. Trains are also operated from JR Namba to Kamo and through from JR Namba to the Nara Line in the early morning.
Stations
- S: Trains stop.
- s: Only starting trains for JR Namba stop.
- |, ↑, ↓: Trains pass.
- ∥: Trains do not run on this section.
- ↑, ↓: only one direction
Local trains (普通) stop at every station between Kamo and JR Namba.
| Station name |
Regional Rapid Service
区間快速 |
Direct Rapid Service
直通快速 |
Rapid Service
快速 |
Yamatoji Rapid Service
大和路快速 |
Yamatoji Liner
やまとじライナー |
Connections |
Location |
| Yamatoji Line (Kansai Line) |
| Kamo |
加茂 |
S |
|
S |
S |
|
S |
Kansai Main Line (for Kameyama) |
Kizugawa |
Kyoto Prefecture |
| Kizu |
木津 |
S |
S |
S |
S |
S |
Gakkentoshi Line, Nara Line |
| Narayama |
平城山 |
S |
S |
S |
S |
S |
|
Nara |
Nara Prefecture |
| Nara |
奈良 |
S |
S |
S |
S |
S |
S |
Sakurai Line |
| Kōriyama |
郡山 |
S |
S |
S |
S |
↓ |
↑ |
|
Yamatokoriyama |
| Yamato-Koizumi |
大和小泉 |
S |
S |
S |
S |
↓ |
↑ |
|
| Hōryūji |
法隆寺 |
S |
S |
S |
S |
S |
S |
|
Ikaruga,
Ikoma District |
| Ōji |
王寺 |
S |
S |
S |
S |
S |
S |
Wakayama Line
Kintetsu: Ikoma Line, Tawaramoto Line (Shin-Ōji Station) |
Oji, Kitakatsuragi District |
| Sangō |
三郷 |
| |
| |
| |
| |
↓ |
↑ |
|
Sango,
Ikoma District |
| Kawachi-Katakami |
河内堅上 |
| |
| |
| |
| |
↓ |
↑ |
|
Kashiwara |
Osaka Prefecture |
| Takaida |
高井田 |
| |
| |
| |
| |
↓ |
↑ |
|
| Kashiwara |
柏原 |
| |
s |
| |
| |
↓ |
↑ |
Kintetsu: Domyoji Line, Osaka Line (Katashimo Station) |
| Shiki |
志紀 |
| |
| |
| |
| |
↓ |
↑ |
|
Yao |
| Yao |
八尾 |
| |
| |
| |
| |
↓ |
↑ |
|
| Kyūhōji |
久宝寺 |
S |
S |
S |
S |
↓ |
↑ |
Osaka Higashi Line |
| Kami |
加美 |
| |
Through to the Osaka Higashi Line |
| |
| |
↓ |
↑ |
|
Hirano-ku, Osaka |
| Hirano |
平野 |
| |
| |
| |
↓ |
↑ |
|
| Tōbu-shijō-mae |
東部市場前 |
| |
| |
| |
↓ |
↑ |
|
Higashisumiyoshi-ku, Osaka |
| Tennōji |
天王寺 |
S |
S |
S |
S |
S |
Osaka Loop Line, Hanwa Line
Osaka Subway: ● Midōsuji Line, ● Tanimachi Line
Kintetsu: Minami-Osaka Line (Osaka Abenobashi Station)
Hankai: Uemachi Line (Tennoji-eki-mae Station) |
Tennoji-ku, Osaka |
| Shin-Imamiya |
新今宮 |
S |
S |
S |
S |
S |
Osaka Loop Line
Nankai: Kōya Line, Nankai Main Line
Osaka Subway: ● Midōsuji Line (Dōbutsuen-mae Station), ● Sakaisuji Line (Dōbutsuen-mae Station)
Hankai: Hankai Line (Minamikasumichō Station) |
Naniwa-ku, Osaka |
| Imamiya |
今宮 |
S |
| |
| |
↓ |
↑ |
Osaka Loop Line |
| JR Namba |
JR難波 |
∥ |
S |
∥ |
S |
∥ |
Kintetsu: Namba Line (Kintetsu Namba Station)
Hanshin: Hanshin Namba Line (Kintetsu Namba Station, Opening in spring, 2009)
Nankai: Nankai Main Line, Koya Line (Namba Station)
Osaka Subway: ● Midōsuji Line (Namba Station), ●Yotsubashi Line (Namba Station), ● Sennichimae Line (Namba Station) |
| Osaka Loop Line |
| Ashiharabashi |
芦原橋 |
S |
|
|
| |
|
↑ |
Nankai: Shiomibashi Line (Ashiharachō Station) |
Naniwa-ku, Osaka |
Osaka Prefecture |
| Taishō |
大正 |
S |
| |
↑ |
Osaka Subway: ● Nagahori Tsurumi-ryokuchi Line |
Taisho-ku, Osaka |
| Bentenchō |
弁天町 |
S |
S |
↑ |
Osaka Subway: ● Chūō Line |
Minato-ku, Osaka |
| Nishikujō |
西九条 |
S |
S |
↑ |
Sakurajima Line (JR Yumesaki Line)
Hanshin: Nishi-Osaka Line |
Konohana-ku, Osaka |
| Noda |
野田 |
S |
| |
↑ |
Osaka Subway: ● Sennichimae Line (Tamagawa Station) |
Fukushima-ku, Osaka |
| Fukushima |
福島 |
S |
| |
↑ |
Hanshin: Main Line
JR Tōzai Line (Shin-Fukushima Station) |
| Osaka |
大阪 |
S |
S |
S |
Tōkaidō Main Line (JR Kyoto Line, JR Kobe Line, JR Takarazuka Line), JR Tōzai Line (Kitashinchi Station)
Osaka Subway: ● Tanimachi Line (Higashi-Umeda Station), ● Yotsubashi Line (Nishi-Umeda Station), ● Midōsuji Line (Umeda Station)
Hankyu: Kōbe Line, Kyoto Line, Takarazuka Line (Umeda Station)
Hanshin: Main Line (Umeda Station) |
Kita-ku, Osaka |
| Continuing |
to Tennoji |
to Amagasaki |
|
to Tennoji |
|
|
|
|
Comments
No comments have been added.
|